THE PRE-PREPARATION OF THE DISTRIBUTION OF ELECTRICITY AND WATER IS AN ESSENTIAL PART OF KITCHEN UNITS

The water connection consists of a surface pipe for connecting the sink, faucet, and dishwasher.
The electrical connection consists of a surface arrangement of cables for built-in appliances with their termination in a surface box with a cover in the design of Legrand Niloe – 5 pcs and a surface distribution of cables as preparation for a socket system for small appliances.

The drawer system for small appliances, located under the upper KL cabinets, is solved using 2 pcs of a two-socket Corner Compact 230V module.

zásuvky